定稿含 33 行、4 列。列名为原式ID/来源/定位、转录或建议式、符号、单位与边界、采用说明/待核。
表中数据
| 原式ID/来源/定位 | 转录或建议式 | 符号、单位与边界 | 采用说明/待核 |
|---|---|---|---|
| SM-E001; R23-L05; Eq.(1); page-image verified; PDF 3 | dM_H2/dt = m_dot_H2,out (printed) | ; M:kg; t:s; m_dot_out:kg/s positive outward by prose No inlet mass during flight | Use mass-conservation negative sign with documented correction 与p4 Eq.(6)质量减少冲突;不得照抄正号。 |
| SM-E002; R23-L05; Eq.(6); PDF 4 | M_f = M_i - m_dot_out * dt | ; kg; kg/s; s All hydrogen leaving vessel; resolve FC feed vs vent split | S05 baseline/cases mass closure 不要将末态残余氢默认为0;单独记各出流。 |
| SM-E003; R23-L05; Eqs.(2),(5),(7); PDF 3–4 | M_f*u_f = M_i*u_i + Q_dot_in*dt - m_dot_out*dt*h_out | ; u,h:J/kg; Q_dot:W; t:s No shaft work; vessel-Al heat capacity neglected in paper; outgoing enthalpy specified by extraction phase | S05 P/T evolution and near-critical trend 分别给FC取气与放散出流焓/流量;不能只扣质量不扣焓。 |
| SM-E004; R23-L05; Thermodynamic modeling; Ref.[29]; PDF 4,12 | rho = M/V; u = U/M; (P,T,phase,h_out) = EOS_paraH2(rho,u,extraction_state) | ; SI; absolute P; hydrogen composition fixed explicitly Paper uses para-hydrogen database/REFPROP10.0; dt60s | EOS state checks; no ideal-gas substitution at cryogenic conditions 此为实现接口说明,不是论文新编号公式;原表缺初始T,出流相态/阀策略须说明。 |
| SM-E005; R23-L05; Eqs.(8),(9); page-image verified; PDF 5 | t_cyl = Di/2*(exp(p/(S*E))-1); t_dome = Di/2*(exp(0.5*p/(S*E))-1) | ; Di,t:mm; p,S:same pressure unit; E:dimensionless 6061-T6; S121MPa; E0.9; minimum1.27mm; ASME2019 method used by paper | Case1 geometry loss and Case2 weight growth 用于复现文献结构模型,不代表本轮结构认证;不能把旧规范作为现行法规核验。 |
| SM-E006; R23-L05; Eqs.(10),(11); PDF 5 | m_v = rho_Al*V_Al; m_H2,0 = rho_H2,0*V_inner | ; Paper:rhoAl2.7g/cm3; rhoH2,0=66.3g/L Shell material volume; fixed initial H2 density in both cases | Distinguish material density/H2 density/full-system mass 完整安装附件另列,不用壳体模型覆盖完整系统。 |
| SM-E007; R23-L05; Eqs.(12),(13); page-image verified; PDF 5 | P = 0.5*rho_air*V^3*S*CD0 + 2*W^2/(pi*e*AR*rho_air*V*S); e=1.78*(1-0.05*AR^0.68)-0.64 | ; P:W; W:weight N; rho:kg/m3; V:m/s; S:m2 Fixed-wing trimmed cruise; paper calibrates CD0 to292W; etaFC held fixed afterwards | S05 Case2 power315.6W and delta-mass2.47kg 不是四旋翼悬停模型;空气密度p5用1.05kg/m3,表列高度另有914m。 |
| SM-E008; R23-L05; Eq.(14); result p10; PDF 6 | eta_FC = P_el/(m_dot_FC * LHV) | ; P:W; m_dot:kg/s; LHV:J/kg Average electrical power vs hydrogen consumed by FC; paper reports51.97% | No double subtraction of BOP losses already included in efficiency p10误引equation16;不是同一符号W的飞机重量N;毛/净功率需锁定。 |
| SM-E009; R23-L05; Modeling procedure; PDF 6 | terminate when P_vessel < 200 kPa | ; P:kPa; threshold must have same pressure basis FC minimum feed-pressure model | S05 event handling 其余四旋翼SOC/thermal/power failure limits不能由此替代。 |
| SM-E010; R23-L03; Eqs.(1)–(6); Fig.3; PDF 3–6 | Q_dot_total = Q_dot_supports + Q_dot_tubes + Q_dot_MLI; each path uses conduction/convection/radiation or calibrated MLI model | ; Total W vs local flux W/m2 must be distinguished Support k(T), cold-gas shielding, vacuum/MLI layer density and calibrated workmanship | Ground2.87W / flight3.29W targets with boundaries 不同MLI/支撑/管路不能套同一常数;源Eq1为局部通量。 |
| SM-E011; R23-L06; Eq.(1); PDF 4 | GI = m_fuel/(m_fuel+m_tank) | ; dimensionless; multiply100 for percent Fuel + reservoir structure; not all FC/BOP/installed hardware | Do not confuse24%tankGI with aircraft energy-system mass fraction 比较完整装机质量时另计阀管/保温/安装/BOP。 |
| SM-E012; R23-L06; Eq.(2); Table2 p7; PDF 5 | N.BoR = (cumulative_boiloff/total_available_fuel)/T_day | ; 1/day or %/day; g/h is a different reporting form Open-vent boil-off bench; slopes obtained by OLS | Reproduce eight Table2 points; no refit-validation reuse 开放出口蒸发率不能在闭合FC任务中全算成额外排放。 |
| SM-E013; R23-L06; Eq.(3); PDF 8 | P(t)=P_mean+P_amp*sin(2*pi*f*t) | ; P:W; f:Hz; t:s Bench:mean300–1000W; amplitude<=100W; frequency<=1.28Hz; pressure reserve available | Dynamic bench replay boundary 不支持任意负载斜率外推。 |
| SM-E014; R23-L06; Eq.(4); PDF 10 | M_H = P_el*t/(33.3*eta_FC) | ; P:W; t:h; 33.3Wh/g -> M:g Constant-power/efficiency preliminary sizing before boil-off/unused reserve | Energy-to-fuel unit audit; add loss/reserve consistently 原文称33.3Wh/g electrical energy content,物理上是H2 LHV;电输出还要eta。 |
| SM-E015; R23-L06; Eqs.(5),(6); PDF 10 | V_t = M_H*(1+V_excess)/rho_LH2; V_t = 4*pi*r^3/3 + pi*r^2*L_cyl | ; Use consistent kg/m3 and m3; V_excess:dimensionless Cylindrical body plus hemispherical ends; paper usesrho71kg/m3 | Preliminary LH2 volume only L是圆柱段长,不自动等于全罐长;此常数密度不能代低温高压EOS。 |
| SM-E016; R23-L06; Eq.(7); PDF 10 | t_w = P*r*FoS/sigma_y | ; P and sigma:same units; r,t:m First-order cylinder/hemisphere preliminary approximation | Early sizing lead, not final installed-mass model 不可代替失稳、接头、循环/疲劳、支撑、外壳真空载荷与安全认证。 |
| SM-E017; R23-L06; Eq.(8); page-image verified; PDF 12 | Published expression contains rho_Ti within final shell term and another rho_Ti outside the sum | ; Shell volume times ONE material density required Preliminary tank structural mass | Hold equation; useTable4/5 only after boundary review 密度重复、首个圆柱壳系数可疑;原样实施量纲不一致,须从几何重新列各壳体再计算。 |
| SM-E018; R23-L06; Eqs.(9),(10); PDF 12 | q_in=h*(T_inf-T_s)+eps*sigma*(T_inf^4-T_s^4); q_out=K*(T_s-T_LH2)/delta_ins | ; These forms are W/m2; multiply appropriate area for total W Natural convection outside; effective insulation K; steady balance | Thermal dimensional audit before calibration 原文变量名Q易被误作总W;L符号与几何罐长/绝热厚度需分开。 |
| SM-E019; R23-L06; Eq.(17); page-image verified; PDF 12 | Recommended after defining positive inward heat: m_dot_boil = Q_dot_to_LH2/h_fg(P) | ; kg/s; Q:W; hfg:J/kg Saturated two-phase approximation with pressure-dependent latent heat | Use measuredBoR; preserve pressure dependence; not a supercritical model 原式分子写K*A*(Ts-Tinf),与Eq10指向LH2温差不一致;不可按负蒸发量用。修正形式为工程守恒建议。 |
| SM-E020; R23-L11; Figs.1–3; page images; PDF 2–3 | FC+DC/DC; passive FC+B through blocking MOSFET; active FC+DC/DC+B with EMS and battery monitor | ; Electrical power at explicitly named converter/bus/stack boundary Bench active scheme controls FC converter; battery follows remaining demand | Architecture comparison and FC ripple reduction 主动方案不是可随意改写为两侧都有双向DC/DC的硬件;如改方案需另标设计选择。 |
| SM-E021; R23-L11; Figs.10–13; Table3; PDF 6–7 | Compare H2 use only together with SOC_start and SOC_end; storage mass excluded from Table3 | ; Source H2:L without stated standard state; SOC:fraction Same simulated mission input and similar terminal SOC;600W FC | SOC100% to~75%; reportedactive62L vs passive71L 无原始功率时序/气体状态则不能给精确kg氢回归;正文62/71L与图末端差异保留。 |
| SM-E022; R23-L13; Eq.(14); PDF 17–18 | m_H2(t)=m_H2(0)-integral(P_FC(t)/(LHV_H2*eta_FC(t)),dt) | ; P:W; LHV:J/kg; t:s -> m:kg Paper exampleetaFC0.5; constantFC650W | 80g initial;8g final reported in2h task 原排版把eta(t)放积分外;随时间变化时须放积分内。若eta已包含供氢/吹扫,不再重复扣。 |
| SM-E023; R23-L13; Eq.(15); PDF 18 | SOC(t)=SOC(0)-eta_batt*integral(P_batt(t),dt)/E_batt | ; P_batt>0 discharge; <0 charge; E in Wh with t:h or J with t:s Papereta_batt0.9 applied alike to both signs | Reproducepublishedconvention separately or documentphysicalcorrection 统一乘eta使放电储能扣除与物理损耗口径不清;不能无说明作为R3的通用能量式。 |
| SM-E024; engineering_recommendation; Engineering recommendation from conservation; source contrast L13 Eq15; PDF | dSOC/dt = -P_batt/(eta_dis*E_nom) if P_batt>=0; -eta_ch*P_batt/E_nom if P_batt<0 | ; Define P_batt at bus side; t unit consistent with E; eta_ch,eta_dis fractions Battery internal energy ledger; converter losses outside or included once | Energy closure, reserve andSOCevent checks 这是建议实施式;效率若定义在其他端口应相应调整,不能把本式称论文原式。 |
| SM-E025; R23-L13; Eq.(16); Table11; PDF 18 | C_rate=max(abs(P_batt))/E_batt; 0.20<=SOC<=0.95; stop charging at0.95 | ; P:W; E:Wh -> 1/h (C-rate approximation) Paper uses energy-basedCrate; current/voltage pack limits still required | Peak5.5C and usableSOCwindow SOC初0.95、起飞约0.55、巡航约0.90、终点约0.50;不是完整电池电化学验证。 |
| SM-E026; R23-L12; Eq.(29); PDF 16 | C_req=sum_i((P_req_i/eta_motor)*t_i)/(U_rated*eta_batt*f_usable) | ; P:W; t:h; U:V givesAh; mAh requires x1000 Only segments supplied by battery in chosen lift+cruise architecture | Battery0.558/0.58kg and3725.581/3800mAh comparison 若P_req已是电母线需求不可再除eta_motor;0.85usable与SOC储备防重复。 |
| SM-E027; R23-L12; Eqs.(31),(32); PDF 17 | HC_i=P_req_i/(33.3*eta_FC_i); m_H2=sum_i(HC_i*t_i) | ; HC:g/h forP:W,LHV33.3Wh/g;t:h Each FC-supplied mission segment; fuel-cell efficiency varies with requiredpower | 244.99g sized vs268.2g selected component reference 区分源文Eq25反应能284000J/mol的HHV近似与这里LHV口径,不能混作同一效率。 |
| SM-E028; R23-L12; Eqs.(33),(34); PDF 17 | M_tank=19.07*m_H2^0.82; V_tank=4.63*m_H2^2+45.78*m_H2+0.10 | ; m_H2,M_tank:kg; V_tank:L Regression fromType3/4 gas tank data; case300bar | Baseline sizing regression only 不能用于低温高压、液氢真空夹套或无界小尺度外推。 |
| SM-E029; R23-L12; Eq.(35); PDF 18 | MTOW=(M_FF_prop+M_VTOL_prop+M_FC_sys+M_batt+M_payload)/(1-MF_frame-MF_subsys-MF_avionics) | ; All M:kg; massfractions dimensionless M_FC_sys includesHFC,tank,regulator,controlboard; checkH2andBOPincluded once | Massclosurebefore endurancecomparison 固定翼/VTOL双支路仅适用于该构型;四旋翼应按四推进支路改列。 |
| SM-E030; R23-L09; Fig.2 / strategy prose; PDF 6 | At demand<=500W FC supplies load; at demand>500W battery supplements FC | ; P atnamed port; W Paper explicitlysegment-wise notcontinuous-timecontrol | Secondaryarchitecturelead, notdynamiccontrollerbenchmark p9又写FC恒定额定500W;需先统一恒功率/跟随负载口径,SOC时序与充电参数不全。 |
| SM-E031; R23-L08; Eq.(19); PDF 9 | P(h)=1.13e-6*h^2-0.01*h+51.69 | ; P:W; h:m Specific5-cellstackandpaperconditions; experimentto3000m; modelto5000m | Altitudecouplingtrendonly 实验/模拟和RH工况不同,不能缩放为任意kWUAV净功率系数;先审查Table1单位/能量边界。 |
| SM-E032; engineering_recommendation; Engineering accounting recommendation; L03/L05/L06 evidence chain; PDF | m0 = m_FC_feed + m_tank_vent + m_leak + m_remaining; m_FC_feed = m_reacted + m_purge where that split is measured | ; All masseskg; no termdoublecounted Separate reservoirloss,FCpurgeandunusablepressure-residual | Usable-hydrogen closurebefore endurance 若FC效率由实际总供氢测得,不重复扣purge;未知损失留空/区间。 |
| SM-E033; engineering_recommendation; Engineering interface recommendation; L14 plus L11/L12; PDF | P_FC_bus + P_batt_bus = sum(P_ESC1..4) + P_avionics + P_payload + P_BOP + P_H2_control + P_other | ; Allbus-sideW; P_batt positive discharge; converterloss recorded once Fourrotorswithseparatebranches; netFCnotnameplate; fullmissionevents | Powerfeasibility,phaseenergy,SOCandlandingreserve 如P_FC_bus已扣BOP,不再右侧扣同一辅机;地面液化/压缩不作为机载持续耗电。 |
下载
来源与复核
- 定稿母稿 · S08.3 原式转录、符号与采用边界 项目仓库 · 需访问权限